lape
LAPE e-log
Fields marked with
*
are required
Entry time:
Wed Sep 2 05:41:28 2026
Author
*
:
Type
*
:
- please select -
Routine
Software Installation
Problem Fixed
Configuration
Other
Category:
- please select -
General
Hardware
Software
Network
Other
Aividades do LAPE
Detectores de M?ons
Hardware Problem
Cintiladores
RioPix
Espectroscopia
Subject:
<p> Hoje, efetuamos contagens relativas aos detectores C1-BRA e C2-KET</p> <p>para diferentes limiares e tensões:</p> <p> </p> <table width="500" cellspacing="1" cellpadding="1" border="1"> <tbody> <tr> <td width="42"> </td> <td width="8">Limiar (mV)</td> <td width="41">Tensao (V)</td> <td width="57">Contagem</td> <td width="38">Tempo (s)</td> </tr> <tr> <td width="42">C1</td> <td width="8">-294.4</td> <td width="41">2018</td> <td width="57">4704</td> <td width="38"> <p>576.5</p> </td> </tr> <tr> <td width="42">C1</td> <td width="8">-2000</td> <td width="41">2018</td> <td width="57">29</td> <td width="38">4425</td> </tr> <tr> <td width="42">C1</td> <td width="8">-1001</td> <td width="41">2017</td> <td width="57">327</td> <td width="38">3339</td> </tr> <tr> <td width="42">C1</td> <td width="8">-650</td> <td width="41"> 2012</td> <td width="57"> 895</td> <td width="38"> 2076</td> </tr> <tr> <td width="42">C2</td> <td width="8">-295</td> <td width="41">2012</td> <td width="57">36641</td> <td width="38"> <p>576.5</p> </td> </tr> <tr> <td width="42">C2</td> <td width="8">-2004</td> <td width="41">2012</td> <td width="57">185</td> <td width="38">4425</td> </tr> <tr> <td width="42">C2</td> <td width="8">-1009</td> <td width="41">2013</td> <td width="57">3144</td> <td width="38">3339</td> </tr> <tr> <td width="42">C2</td> <td width="8">-650</td> <td width="41"> 2013</td> <td width="57"> 10040</td> <td width="38"> 2076</td> </tr> </tbody> </table> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455